Title Image

Archive

Albert Weber Manufacturing – Facility Renovations

Albert Weber Manufacturing – Facility Renovations

Summerville, SC

Trident Construction has provided design/build services for three modifications to the existing plant production lines including new equipment foundations, installation of electrical and mechanical systems, and equipment rigging to accommodate the manufacturing of engine blocks, crank shafts, and power trains.

Architect: Stantec Consulting Services Inc.

RELATED PROJECTS

Volvo Cars USA

Rogers and Brown – Corporate Headquarters

ITT – EDO

HCA Distribution

WHAT OUR CLIENTS ARE SAYING

AGRU America, Inc. – Manufacturing Facilities

AGRU America, Inc. – Manufacturing Facilities

Charleston, SC and Georgetown, SC

Trident Construction was selected to complete two manufacturing facilities for Agru America. Both projects used our proven TEAM BUILD design-assist services.

The 53,000 SF Georgetown manufacturing facility consists of a 38,000 SF manufacturing building, a 10,000 SF administration building, and a 5,000 SF testing laboratory to produce geomembrane liner.

The 51,000 SF Charleston facility manufactures custom high-density polyethylene pipes as large as 8 feet in diameter and 2,000 feet long. The Charleston waterfront location allows the lightweight pipes to be extruded directly into a river for towing by ocean-going vessels.

Architect: Varies

Project Size: 51,000 SF – Charleston; 53,000 SF – Georgetown

RELATED PROJECTS

Volvo Cars USA

Rogers and Brown – Corporate Headquarters

ITT – EDO

HCA Distribution

WHAT OUR CLIENTS ARE SAYING

Roper St. Francis Healthcare – Medical Office Building (East and West) Upfits

Roper St. Francis Healthcare – Medical Office Building (East and West) Upfits

West Ashley, SC

Selected by Roper St. Francis to complete the 80,000 SF of upfits in the two new medical office buildings connected to the hospital, Trident led the programming design and construction effort with over thirty-four doctor’s groups. The upfits include medical office space, laboratory space, patient waiting areas, examination rooms, out-patient surgery centers, a laser surgery center, and a dialysis clinic.

Architect: Various

Project Size: 80,000 SF Combined

RELATED PROJECTS

Trident Health System – Moncks Corner Medical Center

Medical University of South Carolina – Storm Eye Institute

Palmetto Behavioral Health

Palmetto Primary Care – Oakbrook

WHAT OUR CLIENTS ARE SAYING

Trident Health System – Regional Medical Center

Trident Health System – Regional Medical Center

North Charleston, SC

Trident Construction has had a long history of working with Trident Regional Medical Center on a variety of projects, including:
Electro Physiology Lab
Mammography Suite
Outpatient Burn Center
Radiology Department Renovation
Pharmacy Renovation
Day Care Building (on campus)
Labor and Delivery
Breast Care Diagnostic Suite
Patient Tower Renovations
Diagnostic Services
Clean Room

Architect: Varies

Project Size: Varies

RELATED PROJECTS

Trident Health System – Moncks Corner Medical Center

Medical University of South Carolina – Storm Eye Institute

Palmetto Behavioral Health

Palmetto Primary Care – Oakbrook

WHAT OUR CLIENTS ARE SAYING

Trident Health System – Medical Arts Center Renovations

Trident Health System – Medical Arts Center Renovations

North Charleston, SC

This project includes a complete exterior brick renovation and multiple tenant upfits for a 70,000 SF medical office building on the campus of Trident Regional Medical Center. Some upfits include an ambulatory surgical center, burn clinic, InvisiVein, Charleston Radiologists, Charleston Neurology, wellness center, and Palmetto Primary Care.

Architect: Varies

Project Size: Varies

RELATED PROJECTS

Trident Health System – Moncks Corner Medical Center

Medical University of South Carolina – Storm Eye Institute

Palmetto Behavioral Health

Palmetto Primary Care – Oakbrook

WHAT OUR CLIENTS ARE SAYING

The NEAR Center

The NEAR Center

Mount Pleasant, SC

Trident Construction provided our TEAM BUILD services for this 16,000 SF medical research and training facility upfit. The Center is an adaptive reuse of existing space within the Vibra Hospital of Charleston located in Mount Pleasant, SC. The project included updating their conference room, classrooms, and clinical training areas.

Architect: SMHa

Project Size: 16,000 SF National Educational and Research Center

RELATED PROJECTS

Trident Health System – Moncks Corner Medical Center

Medical University of South Carolina – Storm Eye Institute

Palmetto Behavioral Health

Palmetto Primary Care – Oakbrook

WHAT OUR CLIENTS ARE SAYING

Summerville Medical Center – Medical Office Building Upfits

Summerville Medical Center – Medical Office Building Upfits

Summerville, SC

After completing the Medical Office Building, Trident Construction provided our proven TEAM BUILD services to lead the collaborative effort to plan, design and construct five upfits including:
Carolina Women’s Care
Lowcountry Urology
Coastal Carolina Bariatric
Maternal Fetal Medicine
Summerville Pediatric Specialists

Architect: Goff D’Antonio

Project Size: 1,600 SF – 4,500 SF Medical Office Building

RELATED PROJECTS

Trident Health System – Moncks Corner Medical Center

Medical University of South Carolina – Storm Eye Institute

Palmetto Behavioral Health

Palmetto Primary Care – Oakbrook

WHAT OUR CLIENTS ARE SAYING

Summerville Medical Center – Hospital Renovations

Summerville Medical Center – Hospital Renovations

Summerville, SC

Trident Construction provided our proven TEAM BUILD services to lead the collaborative effort to plan, design and renovate over thirty projects within the Summerville Medical Center Hospital including:

  • Central Sterile Unit
  • Med Surge Unit
  • Observation Unit
  • 2nd and 3rd Floor Patient Rooms
  • Neonatal Intensive Care Unit
  • Pediatric Intensive Care Unit
  • Mammography Lab
  • Emergency Department
  • Pharmacy and Clean Room
  • CT Room
  • Imaging Department
  • Parking Lot Expansion
  • Lobby and Public Areas

Architect: Various

Project Size: 500 SF – 30,000 SF

RELATED PROJECTS

Trident Health System – Moncks Corner Medical Center

Medical University of South Carolina – Storm Eye Institute

Palmetto Behavioral Health

Palmetto Primary Care – Oakbrook

WHAT OUR CLIENTS ARE SAYING

Roper St. Francis Healthcare – Medical Plaza

Roper St. Francis Healthcare – Medical Plaza

West Ashley, SC

In a team effort with Cogdell Spencer, Roper St. Francis Hospital and the design team, Trident provided design-build services for this multi-practice medical office located on the main hospital campus. The project consists of the construction of a new two story brick and stucco medical plaza including upfits for six medical offices, radiology, out-patient surgery, and laboratory space.

Architect: Peterson Associates, Inc.

Project Size: 25,000 SF Medical Plaza

RELATED PROJECTS

Trident Health System – Moncks Corner Medical Center

Medical University of South Carolina – Storm Eye Institute

Palmetto Behavioral Health

Palmetto Primary Care – Oakbrook

WHAT OUR CLIENTS ARE SAYING

Roper Hospital – Berkeley ASC

Roper Hospital – Berkeley ASC

Moncks Corner, SC

This project is a 10,330 SF expansion to the existing day hospital and was completed in 12 months. The expansion includes three surgical suites, an endoscopy suite, 10 pre-op suites, an infant pre-op/post-op room, six post-op suits, support laboratories, nurse stations, a grand entry, and relocation of the hospital med-gas and electrical services.

Architect: SGM Coast

Project Size: 10,330 SF Ambulatory Surgical Center

RELATED PROJECTS

Trident Health System – Moncks Corner Medical Center

Medical University of South Carolina – Storm Eye Institute

Palmetto Behavioral Health

Palmetto Primary Care – Oakbrook

WHAT OUR CLIENTS ARE SAYING